HEAVY LIFT PROJECTS

November 2009 – 400ton Crane Barge “Al Amlaq” completed load-out of Anchor handling tug onto a cargo barge 2 nautical miles offshore Dubai











October 2009 – Heavy-Lift operations performed : Loading Arm overhaul(removal and re-installation) at the Ras Gas Berth facility, Ras Laffan, Qatar.











July 2009 – Mubarak Marine performed the removal of a generator unit from the Engine room of an LNG tanker at Dubai anchorage.











March 2008 – Heavy Lift Discharge of multiple Umbilical reels at Mesaieed Port, Qatar.











February 2008 – Mubarak Marine performed with its 400tonne Heavy lift crane barge “Al Amlaq” discharge of multiple cargo barges at Palm Jebel Ali, Dubai for Jan De Nul.